VERGENNES — Work has begun to correct longstanding drainage problems in the Crosby Farms development area, City Manager Mel Hawley told aldermen on at their Aug. 21 meeting.
Hawley said after a firm was hired to “televise” about 60 percent of the stormwater drainage systems, two blockages were found, some iron bars (known as rebar, which holds concrete in place) sticking into one 24-inch pipe, and a 15-by-6-inch stone in another drainage pipe.